For councils & public works teams
Planning vegetation-management purchases before the Christmas shutdown?
Put the machine on the slope and keep your people off it. Assess remote-controlled mowing on your own sites before procurement and delivery windows tighten.
The operational case
A safer, more capable method for difficult sites.
Assess Green Climber against the work your team does now—not as an isolated machine purchase.
Control the machine from a planned line-of-sight position.
Put distance between the operator and the immediate cutting zone while retaining site-specific controls, exclusions and supervision.
Test what the available team can complete.
Measure task time, crew requirements, access and repeat visits on representative sites.
Compare the complete cost of the current method.
Include labour, contractors, traffic management, transport, servicing and utilisation—not only purchase price.
Free Proof of Capability Trial
Use representative sites to compare the alternatives properly.
After the preliminary assessment, SME Mowers can bring the recommended machine and attachment to your site and compare it directly with the method your team currently uses. Trials are free, scheduled with our Green Climber specialist and available Australia-wide.
Hand-crew comparison
Previous comparisons have involved a five-person hand crew versus one Green Climber operator. Confirm actual crew requirements and output on your site.
Traffic-control personnel
In many comparable roadside applications, traffic-control personnel have reduced from six to two. Actual requirements remain site-specific.
Record the evidence
Measure task time, crew requirements, access, operator position, traffic controls, finish and practical deployment.
Comparisons are indicative examples, not guaranteed outcomes. Trial results depend on terrain, vegetation, configuration, conditions and the approved work method.
Priority applications
Built for the sites your current method struggles to maintain.
Suitability is confirmed against the terrain, vegetation, access and required finish.

Assessment to purchase
A defined route from site problem
to purchase.
Preliminary Site Assessment
Share photos, video and details of the terrain, vegetation, access and current maintenance process so we can select the right machine and head.
Free PoC Trial
Where suitable, test the recommended configuration on representative work and measure it against your current method.
Business case
Use trial findings, the ROI calculator, quotation and support information to develop the internal case.
Purchase pathway
Confirm equipment availability, delivery timing and the most suitable sourcing method for your organisation.
Government purchasing
Available procurement pathways.
SME Mowers can discuss the appropriate pathway and supply configuration and quotation information for internal review.
Access, eligibility and supplier scope vary by agency and purchase. Confirm the applicable pathway before relying on it.Free Preliminary Site Assessment
Show us the work your team needs to complete.
We’ll assess the terrain, vegetation, access and current method, recommend a suitable Green Climber configuration and determine whether a free Proof of Capability Trial is appropriate.
Freecall 1800 088 567sales@smemowers.com.au
Request a Preliminary Site Assessment
Tell us where the site is and what makes it difficult. Photos or video can follow after the initial enquiry.
Capability, slope suitability and productivity depend on machine configuration, attachment, terrain, vegetation, ground conditions, operator training and site controls. Site assessment and calculator outputs do not replace the organisation’s risk assessment, procurement, engineering, financial or compliance obligations.